{"id":9290,"date":"2025-12-04T17:02:54","date_gmt":"2025-12-04T10:02:54","guid":{"rendered":"https:\/\/ligaasuransi.com\/?p=9290"},"modified":"2025-12-04T17:02:54","modified_gmt":"2025-12-04T10:02:54","slug":"sejarah-dan-perkembangan-pembangkit-listrik-tenaga-sampah-pltsa-dari-dunia-ke-indonesia","status":"publish","type":"post","link":"https:\/\/ligaasuransi.com\/en\/sejarah-dan-perkembangan-pembangkit-listrik-tenaga-sampah-pltsa-dari-dunia-ke-indonesia\/","title":{"rendered":"History and Development of Waste-to-Energy Power Plants (PLTSa): From the World to Indonesia"},"content":{"rendered":"<p><i><span style=\"font-weight: 400;\">(A Review from a Risk Management and Insurance Perspective by an Expert Insurance Broker)<\/span><\/i><\/p>\n<h3><span style=\"font-weight: 400;\">Introduction<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Waste has become one of the biggest environmental challenges in the modern world. In large cities, waste volumes increase with population growth and urbanization. Meanwhile, the need for electricity continues to grow to support economic activity. This is where the concept of Waste-to-Energy Power Plants (PLTSa) emerged \u2014 an innovation that combines waste management and renewable energy production.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, despite its enormous economic potential, waste-to-energy projects also pose complex technical, environmental, and financial risks. From a risk management and insurance perspective, waste-to-energy projects fall into the category of <\/span><i><span style=\"font-weight: 400;\">high-risk infrastructure projects <\/span><\/i><span style=\"font-weight: 400;\">which require comprehensive protection from the planning stage to commercial operations.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">1. Early History of PLTSa in the World<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The waste-to-energy (WTE) concept first emerged in Europe in the late 19th century, when cities such as Nottingham (UK) and Hamburg (Germany) began using waste incineration to reduce waste volume and harness the heat for district heating.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the 1950s\u20131970s, incineration technology developed rapidly in developed countries, particularly Denmark, Sweden, and Japan. These countries faced limited landfill space, so they sought more efficient and environmentally friendly solutions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">World Milestones of PLTSa:<\/span><\/p>\n<table>\n<thead>\n<tr>\n<th><b>Year<\/b><\/th>\n<th><b>Country<\/b><\/th>\n<th><b>Key Innovations<\/b><\/th>\n<th><b>Risk Notes<\/b><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><span style=\"font-weight: 400;\">1904<\/span><\/td>\n<td><span style=\"font-weight: 400;\">English<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Nottingham&#8217;s first incinerator<\/span><\/td>\n<td><span style=\"font-weight: 400;\">High fire risk, no emission controls<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">1970<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Japan<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Modern PLTSa with emission control system<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Insurance claims due to air pollution are starting to emerge<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">1980<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Denmark<\/span><\/td>\n<td><span style=\"font-weight: 400;\">District heating system from PLTSa<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Risk of boiler explosion and corrosion<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">1990<\/span><\/td>\n<td><span style=\"font-weight: 400;\">German<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Strict environmental standards (EU Directive)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Insurance companies are starting to require environmental risk audits.<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">2000-an<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Singapore<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Tuas South Incineration Plant<\/span><\/td>\n<td><span style=\"font-weight: 400;\">PLTSa success model with complete insurance scheme<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3><span style=\"font-weight: 400;\">2. Development of PLTSa Technology<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">PLTSa technology continues to evolve from a simple combustion system to a sophisticated energy system based on high efficiency and strict emission controls.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Key Technology:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Incineration \u2013 Waste is burned at temperatures of 850\u20131000\u00b0C to produce heat that drives a power generating turbine.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Gasification \u2013 Converting waste into synthetic gas (syngas) that can be burned to produce energy.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Pyrolysis \u2013 Heating waste without oxygen to produce synthetic gas and oil.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Refuse Derived Fuel (RDF) \u2013 Waste is processed into solid fuel with high calorific value.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Key Technical Risks:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Failure of combustion and cooling system<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Explosion due to accumulation of flammable gas<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Corrosion on <\/span><i><span style=\"font-weight: 400;\">boiler <\/span><\/i><span style=\"font-weight: 400;\">and turbine<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Damage to the emission filtration system (baghouse filter)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Air pollution and toxic ash leaks<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">From an engineering insurance perspective, each of these stages has different risks that require specific types of policies, such as:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Construction All Risks (CAR) or Erection All Risks (EAR) during construction,<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Machinery Breakdown (MB) and Property All Risks (PAR) during operations, as well as<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Public &amp; Environmental Liability Insurance for risks to third parties and environmental pollution.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">3. Experience of Developed Countries in Managing PLTSa Risks<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Japan \u2013 Highest Safety Standards<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Japan has one of the largest waste-to-energy (WTP) networks in the world. Nearly all major cities, including Tokyo, Osaka, and Yokohama, have these facilities.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Japan emphasizes operational and environmental safety through annual risk audits and ISO 14001 certification. Insurance companies in Japan require a detailed risk<\/span><i><span style=\"font-weight: 400;\"> assessment prior<\/span><\/i><span style=\"font-weight: 400;\"> to policy issuance, including a physical inspection of the boiler and gas scrubber systems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Singapore \u2013 Integrated Model of Insurance and Operations<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Singapore has the Tuas South Incineration Plant, which generates over 2,800 MWh of electricity per day. The country uses an EPC (Equivalent to 1000 MWh) contract system.<\/span><i><span style=\"font-weight: 400;\">Engineering, Procurement, Construction<\/span><\/i><span style=\"font-weight: 400;\">) with mandatory insurance clause.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Every project must have:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">CAR\/EAR Policy during construction<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Operational All Risks Policy during operation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Third-Party Liability Insurance with high limits<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Environmental Impairment Liability (EIL) for pollution risks<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">This model has proven effective \u2014 the rate of large claims is very low due to the presence of loss<\/span><i><span style=\"font-weight: 400;\"> prevention, which<\/span><\/i><span style=\"font-weight: 400;\"> is good.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">4. The journey of PLTSa in Indonesia<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Initial Idea<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The idea of \u200b\u200bbuilding a waste-to-energy plant (PLTSa) in Indonesia emerged in 2005, but its implementation only became serious after the issuance of Presidential Regulation (Perpres) No. 35 of 2018 concerning the Acceleration of Waste-to-energy Plant (PLTSa) Development in 12 major cities, including Jakarta, Surabaya, and Bandung.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Bantar Gebang and Surabaya PLTSa projects became national pioneers, followed by plans in Semarang, Denpasar, and Makassar.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Obstacles Faced:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Uncertainty in technology and waste supply<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Social resistance (environmental and odor issues)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Financing constraints and electricity tariff schemes (Feed-in Tariff)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Lack of understanding of project risks by non-technical parties<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">From an insurance perspective, many waste-to-energy (WTE) projects in Indonesia have not been prepared with an insurance-minded approach from the outset. As a result, project risks are sometimes not fully identified in EPC contracts and financing documents.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">5. Main Risks of PLTSa from a Risk Management and Insurance Perspective<\/span><\/h3>\n<ol>\n<li><span style=\"font-weight: 400;\"> Physical Risks<\/span><\/li>\n<\/ol>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fire due to failure of combustion temperature control<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Explosion from flammable gas or methane accumulation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Damage to equipment such as boilers, turbines, conveyors, and emission systems<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">\u27a1\ufe0f<\/span> <i><span style=\"font-weight: 400;\">Relevant insurance:<\/span><\/i><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">CAR\/EAR, Property All Risks, Machinery Breakdown<\/span><\/p>\n<ol>\n<li><span style=\"font-weight: 400;\"> Operational Risk<\/span><\/li>\n<\/ol>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Decreased efficiency due to variations in waste water content<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Disruption of electricity or fuel supply<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Automatic control system failure<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">\u27a1\ufe0f<\/span> <i><span style=\"font-weight: 400;\">Relevant insurance:<\/span><\/i><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Business Interruption (BI) to cover revenue losses due to the cessation of operations.<\/span><\/p>\n<ol>\n<li><span style=\"font-weight: 400;\"> Environmental Risks<\/span><\/li>\n<\/ol>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Air emissions exceed the threshold<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Leakage of toxic ash or liquid waste<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Claims from local communities due to pollution<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">\u27a1\ufe0f<\/span> <i><span style=\"font-weight: 400;\">Relevant insurance:<\/span><\/i><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Environmental Liability Insurance (EIL) dan Third-Party Liability Insurance (TPL)<\/span><\/p>\n<ol>\n<li><span style=\"font-weight: 400;\"> Project and Financial Risks<\/span><\/li>\n<\/ol>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Project delay (delay in start-up)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Failure of contractor or subcontractor<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Delay in licensing<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">\u27a1\ufe0f<\/span> <i><span style=\"font-weight: 400;\">Relevant insurance:<\/span><\/i><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Advance Loss of Profit (ALOP), Contractors\u2019 Liability Insurance, dan Professional Indemnity Insurance<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">6. The Strategic Role of Insurance Brokers in the PLTSa Project<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">An expert insurance broker has a key role in assisting project owners, EPC contractors, and lenders in:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Analyzing Project Risks<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Do <\/span><i><span style=\"font-weight: 400;\">risk mapping comprehension<\/span><\/i><span style=\"font-weight: 400;\"> \u2014 technical, financial, environmental, and social.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Developing a Comprehensive Insurance Program<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Ensure all risks are covered in insurance<\/span><i><span style=\"font-weight: 400;\"> metrics that<\/span><\/i><span style=\"font-weight: 400;\"> comply with the contract and lender requirements.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Premium Negotiation and Special Clauses<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Arrange <\/span><i><span style=\"font-weight: 400;\">endorsement<\/span><\/i><span style=\"font-weight: 400;\"> And <\/span><i><span style=\"font-weight: 400;\">waiver of subrogation required<\/span><\/i><span style=\"font-weight: 400;\"> for the project bankable.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Coordination with Insurers and Technical Surveyors<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Ensure loss<\/span><i><span style=\"font-weight: 400;\"> prevention and<\/span><\/i><span style=\"font-weight: 400;\"> risk inspections are conducted periodically.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Claims Assistance<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">In the event of an accident, the broker ensures that claims are settled quickly, fairly, and according to the contract value.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">In the context of PLTSa, brokers are not just policy intermediaries, but strategic partners in renewable energy project risk management.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">7. Case Study: Fire at a European Waste-to-Energy Power Plant and Lessons for Indonesia<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">A waste-to-energy plant (PLTSa) in Germany once experienced a major fire in the exhaust gas filter room due to a failed heat sensor. Losses reached \u20ac18 million. However, thanks to a Property All Risks and Business Interruption policy, the project owner was able to restore the facility within six months.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Lessons for Indonesia:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Risk audits should be conducted at least twice a year.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Control and alarm systems must be insured as critical<\/span><i><span style=\"font-weight: 400;\"> component<\/span><\/i><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Insurance value (<\/span><i><span style=\"font-weight: 400;\">sum insured<\/span><\/i><span style=\"font-weight: 400;\">) must match the actual replacement value<\/span><\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400;\">8. Challenges and Opportunities for PLTSa Insurance in Indonesia<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Indonesia has the potential to use waste-to-energy plants (PLTSa) to process over 12,000 tons of waste per day in major cities. However, project implementation remains limited due to:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Low insurance literacy among project managers<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">There isn&#8217;t any yet <\/span><i><span style=\"font-weight: 400;\">standard insurance scheme nationally<\/span><\/i><span style=\"font-weight: 400;\"> for WTE projects<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The capacity of local insurance companies to cover complex risks like this is still minimal.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">But on the other hand, this also opens up huge opportunities for professional insurance brokers like L&amp;G Insurance Broker to:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Educating the market<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Compile <\/span><i><span style=\"font-weight: 400;\">tailor-made insurance solution<\/span><\/i><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Connecting the PLTSa project with capacity reinsurance<\/span><i><span style=\"font-weight: 400;\"> international<\/span><\/i><\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400;\">Conclusion<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Waste-to-energy (WTE) is more than just an energy technology project\u2014it is a multidisciplinary project that encompasses environmental, social, financial, and legal aspects. World history shows that the success of WTE projects always depends on two key factors: strong risk management and appropriate insurance coverage.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For Indonesia, building a waste-to-energy power plant (PLTSa) also means building a new culture in managing the risks of green infrastructure projects.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">The role of insurance brokers is becoming increasingly important in bridging the gap between the idealism of clean energy development and the reality of risks on the ground.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With a professional, transparent, and risk-based approach, the PLTSa project in Indonesia can be a sustainable energy solution as well as a modern waste management model that is safe, efficient, and environmentally friendly.protected.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">L&amp;G Insurance Broker is a leading insurance broker in Indonesia with extensive experience in energy and infrastructure projects, including waste-to-energy power plants (WTPs). We provide professional risk consulting, insurance placement, and claims assistance to protect investments from technical, environmental, and financial risks. With L&amp;G, your WTP project will be safer, more efficient, and more sustainable.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\ud83d\udca1<\/span> <i><span style=\"font-weight: 400;\">L&amp;G \u2013 Your Trusted Partner in Energy Risk Solutions.<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">\u2014<\/span><\/p>\n<p><b>DON&#8217;T WASTE YOUR TIME AND SECURE YOUR FINANCIAL AND BUSINESS WITH THE RIGHT INSURANCE.<\/b><\/p>\n<p><b>HOTLINE L&amp;G 24 JAM:<\/b><a href=\"https:\/\/wa.me\/628118507773?text=Halo%20Liberty,%20Saya%20sudah%20berkunjung%20ke%20website%20lngrisk.co.id.%20Boleh%20saya%20tanya%20lebih%20jauh?\"><b> 0811-8507-773<\/b><\/a><b> (CALL \u2013 WHATSAPP \u2013 SMS)<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Website:<\/span><a href=\"http:\/\/lngrisk.co.id\"><span style=\"font-weight: 400;\"> lngrisk.co.id<\/span><\/a><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Email: <\/span><a href=\"mailto:halo@lngrisk.co.id\"><span style=\"font-weight: 400;\">halo@lngrisk.co.id<\/span><\/a><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u2014<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>(A Review from a Risk Management and Insurance Perspective by an Expert Insurance Broker) Introduction Waste has become one of the biggest environmental challenges in the modern world. In large cities, waste volumes increase with population growth and urbanization. Meanwhile, the need for electricity continues to grow to support economic activity. This is where the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":9291,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[1480,1479],"class_list":{"0":"post-9290","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-asuransi-pembangkit-listrik","8":"tag-pembangkit-listrik-tenaga-sampah","9":"tag-pltsa"},"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/9290","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/comments?post=9290"}],"version-history":[{"count":1,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/9290\/revisions"}],"predecessor-version":[{"id":9292,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/9290\/revisions\/9292"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/media\/9291"}],"wp:attachment":[{"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/media?parent=9290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/categories?post=9290"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/tags?post=9290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}