{"id":8305,"date":"2025-10-07T09:57:34","date_gmt":"2025-10-07T02:57:34","guid":{"rendered":"https:\/\/ligaasuransi.com\/?p=8305"},"modified":"2025-10-07T09:57:34","modified_gmt":"2025-10-07T02:57:34","slug":"berapa-tarif-premi-asuransi-cpm-contractors-plant-machinery","status":"publish","type":"post","link":"https:\/\/ligaasuransi.com\/en\/berapa-tarif-premi-asuransi-cpm-contractors-plant-machinery\/","title":{"rendered":"What is the CPM (Contractor&#8217;s Plant &#038; Machinery) Insurance Premium Rate?"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">In the construction, mining, and infrastructure sectors, heavy equipment (plant and machinery) is the backbone of ensuring projects run on schedule. Excavators, bulldozers, cranes, dump trucks, and batching plants worth billions of rupiah are used daily to expedite construction. The investment is substantial, so even the slightest malfunction can significantly impact productivity, costs, and safety.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A common question asked by equipment owners, renters, contractors, and buyers is: &#8220;How much does CPM insurance premium cost?&#8221; For many companies, insurance premiums are considered an additional expense, when in fact, they are an investment in protecting valuable assets.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This is where the role of an experienced insurance broker like L&amp;G Insurance Broker becomes crucial. From the outset, brokers help analyze needs, negotiate competitive premium rates, and ensure coverage aligns with the characteristics of the equipment and the work location. This article will comprehensively discuss the types of equipment covered, the risks involved, examples of losses, types of CPM insurance policies, premium rate determinants, claims procedures, and the vital role of brokers in assisting companies.<\/span><\/p>\n<hr \/>\n<blockquote><p><b>Contact L&amp;G Insurance Broker now at<\/b> <b>Phone number<\/b><a href=\"https:\/\/wa.me\/628118507773?text=Halo%20Liberty,%20Saya%20sudah%20berkunjung%20ke%20website%20lngrisk.co.id.%20Boleh%20saya%20tanya%20lebih%20jauh?\"> <b>08118507773<\/b><\/a><b> for a free consultation before the risks haunt your business.<\/b><\/p><\/blockquote>\n<hr \/>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">What is CPM Insurance?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Contractor&#8217;s Plant &amp; Machinery (CPM) is an insurance policy that provides coverage for heavy equipment used in construction, mining, plantation, and infrastructure projects. This coverage applies to both owned and hired\/leased equipment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Some types of heavy equipment that are usually covered by a CPM policy:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Excavator &amp; Backhoe \u2192 digging and moving soil\/rock.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Bulldozer \u2192 level the ground surface.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dump Truck &amp; Hauler \u2192 transporting mining or construction materials.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Crane (crawler, tower, mobile crane) \u2192 lift and move heavy loads.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Loader &amp; Grader \u2192 road and infrastructure works.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Batching Plant, Crusher Plant, Asphalt Mixing Plant \u2192 supports road and building construction.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">The CPM policy is \u201call risks\u201d, meaning it covers sudden and unexpected physical loss or damage due to accidents, except for risks that are specifically excluded.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">Uses of CPM Insurance<\/span><\/h3>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Asset protection \u2192 the value of heavy equipment can reach billions to hundreds of billions of rupiah.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Maintaining project smoothness \u2192 avoiding downtime due to uncovered damage.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Meeting contract requirements \u2192 many projects require contractors to have CPM coverage.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Increase credibility \u2192 companies with insurance protection are seen as more professional by project owners and investors.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reducing financial burden \u2192 losses are not borne by the individual, but are transferred to the insurance company.<\/span><\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">Risks Faced by Contractor\u2019s Plant &amp; Machinery<\/span><\/h3>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Workplace accidents \u2013 collisions between heavy equipment, overturning, or falling into ravines.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Technical failure \u2013 due to operator negligence, overloading, or mechanical error.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Natural disasters \u2013 floods, earthquakes, landslides, storms, and forest fires.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fires and explosions \u2013 both from engines and external factors.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Theft and robbery \u2013 heavy equipment parked in open areas is vulnerable to theft.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Losses during transportation \u2013 when equipment is moved from one project location to another.<\/span><\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">Example of Loss Case<\/span><\/h3>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A bulldozer caught fire in Kalimantan due to an electrical short circuit, causing losses of up to Rp 4 billion.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">An excavator overturned into a river during embankment construction. Repairs cost Rp 2 billion.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A mobile crane collapsed due to strong winds at a port project, resulting in claims totaling Rp 6 billion.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A dump truck was stolen during a palm oil plantation project, resulting in a loss of Rp 1.5 billion.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A batching plant was damaged by flooding during a toll road project. Repair costs were Rp 10 billion.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Without CPM insurance, the contractor or equipment owner must bear the costs themselves.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">Types of Insurance for Heavy Equipment<\/span><\/h3>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">In addition to the CPM policy, there are additional guarantees and related insurances:<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Third Party Liability (TPL) \u2192 protects against third party claims due to equipment accidents.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Property All Risks (PAR) \u2192 if the equipment is permanently placed in the workshop or site.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Workmen Compensation \/ Jamsostek \u2192 protects operators and workers from accidents.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Marine Cargo \/ Inland Transit \u2192 protects equipment when it is shipped from the factory\/importer to the site.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Business Interruption \u2192 covering losses due to operational downtime.<\/span><\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">Factors Affecting CPM Premium Rates<\/span><\/h3>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Type of equipment &amp; coverage amount \u2013 the more expensive and complex, the higher the premium.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Work locations \u2013 projects in mines, plantations, or flood-prone areas are at higher risk.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Type of work \u2013 equipment used in wet risk (offshore, river, dam) is subject to higher rates than dry projects.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Older equipment is more prone to damage, premiums are higher.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Owner contractor track record \u2013 frequency of previous claims affects rates.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Type of policy coverage \u2013 whether standard or with additional extensions (TPL, flood, earthquake).<\/span><\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">CPM Insurance Premium Rate Estimate<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Referring to market practices and OJK references:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Excavator Rp 5 billion \u2192 rate \u00b10.75% per year \u2192 premium Rp 37.5 million.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Bulldozer Rp 7 billion \u2192 rate \u00b10.75% \u2192 premium Rp 52.5 million.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dump truck Rp. 2 billion\/unit \u2192 rate \u00b10.90% \u2192 premium Rp. 18 million.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Mobile Crane Rp. 10 billion \u2192 rate \u00b10.90% \u2192 premium Rp. 90 million.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Batching Plant Rp 20 billion \u2192 tariff \u00b10.40% \u2192 premium Rp 80 million.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Note: These rates are indicative. Actual premiums depend on equipment condition, project location, type of work, and negotiations with the insurance company.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">CPM Insurance Claim Procedure<\/span><\/h3>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Initial report immediately after the incident.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Damage survey by independent loss adjuster.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Document collection: policy, equipment invoice, chronology report, damage photos.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Claims analysis by insurance companies.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Claim payments according to policy provisions.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">With a broker, the claims process is faster and the results are more optimal because the broker acts as a customer advocate.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">Factors That Determine CPM Insurance Claims<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">In practice, Contractor&#8217;s Plant &amp; Machinery (CPM) insurance claims are not always automatically paid in full. Several factors influence whether a claim is accepted, its amount, and how quickly it is resolved.<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b>Compliance with police requirements<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Each policy has specific clauses and exclusions. If the loss occurs due to an uninsured cause (such as wear and tear or willful negligence), the claim may be denied.<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b>Complete documentation<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">CPM policies require equipment owners to submit damage reports, photographs, invoices, and technical reports from mechanics or surveyors. Incomplete documentation often delays or reduces the value of claims.<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b>Chronology of events<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Claims that are clear, coherent, and reported promptly after the incident have a higher chance of being approved. Delays in reporting are often considered an indication of moral hazard.<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b>Sum insured<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">If the asset is insured below market value (underinsurance), the average clause principle will apply so that the claim is only partially paid.<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b>The role of insurance brokers<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Brokers help ensure claims are prepared according to procedure, minimize disputes with insurance companies, and fight for clients&#8217; rights to maximize claim payments.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">By understanding these factors, owners or contractors can reduce the risk of claims being rejected and ensure heavy equipment is optimally protected.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">CPM Insurance Claim Case Simulation<\/span><\/h3>\n<p><b>Case:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A contractor company was using an excavator with a market value of Rp 5 billion for a dam construction project. During excavation work, the excavator toppled into the river due to a sudden landslide. The equipment sustained severe damage to its engine, hydraulics, and electrical systems.<\/span><\/p>\n<p><b>Cost of loss:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Engine &amp; hydraulic repairs: Rp 2.8 billion<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost of evacuating equipment from the river: Rp. 200 million<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Total loss: Rp. 3 billion<\/span><\/li>\n<\/ol>\n<p><b>Police provisions:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Insurance value: IDR 5 billion<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Annual premium: 0.3% \u00d7 Rp 5 billion = Rp 15 million<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Deductible (own risk): IDR 100 million per claim<\/span><\/li>\n<\/ol>\n<p><b>Claim process:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The contractor reports to the insurance broker within 24 hours.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The broker forwards the report to the insurance company &amp; appoints a loss adjuster.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Survey conducted, losses verified amounting to Rp. 3 billion.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Police happens, loss is guaranteed.<\/span><\/li>\n<\/ol>\n<p><b>Claim calculation:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Loss of IDR 3 billion \u2013 Deductible IDR 100 million = IDR 2.9 billion paid by insurance.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Important Lessons<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Without CPM insurance, the contractor would have had to cover the full Rp 3 billion loss.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">With a premium of only IDR 15 million per year, claims of IDR 2.9 billion can be paid \u2192 the return on risk transfer is very large.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">The Important Role of Insurance Brokers<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Why should you use an insurance broker like L&amp;G Insurance Broker?<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">In-depth risk analysis according to tool and project type.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Negotiate premiums to be more competitive than direct placement.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Develop policy wording that suits your needs, not manufacturer standards.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Claims assistance until payment is complete.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Access to multiple insurance companies for a wider choice.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Providing education &amp; risk management strategies to reduce long-term premium costs.<\/span><\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">Conclusion\u00a0<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Contractor&#8217;s Plant &amp; Machinery (CPM) insurance is a vital tool for protecting heavy equipment in construction, mining, and infrastructure projects. The high value of the equipment and the high risk involved make this insurance mandatory for owners, lessees, and contractors.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">CPM premiums are determined by several factors: equipment value, age, project location, type of work, and claims history. Estimated premiums range from 0.25%\u20130.5% per year of the equipment&#8217;s value. This figure is significantly lower than losses due to damage or loss, which can reach billions of rupiah.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">To ensure efficient premiums with maximum coverage, use the services of an experienced insurance broker like L&amp;G Insurance Broker. With L&amp;G&#8217;s support, you&#8217;ll not only get the best rates, but also coverage that perfectly fits your needs and comprehensive claims assistance.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\ud83d\udc49<\/span><span style=\"font-weight: 400;\">Don&#8217;t leave your heavy equipment unprotected. Contact L&amp;G Insurance Broker today to get a CPM premium simulation tailored to your project needs.<\/span><\/p>\n<hr \/>\n<p><b>DON&#8217;T WASTE YOUR TIME AND SECURE YOUR FINANCES AND BUSINESS WITH THE RIGHT INSURANCE.<\/b><\/p>\n<p><b>HOTLINE L&amp;G 24 JAM: <\/b><a href=\"https:\/\/wa.me\/628118507773?text=Halo%20Liberty,%20Saya%20sudah%20berkunjung%20ke%20website%20lngrisk.co.id.%20Boleh%20saya%20tanya%20lebih%20jauh?\"><b>0811-8507-773<\/b><\/a><b> (PHONE \u2013 WHATSAPP \u2013 SMS)<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Website: lngrisk.co.id<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Email: halo@lngrisk.co.id<\/span><\/p>\n<hr \/>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>In the construction, mining, and infrastructure sectors, heavy equipment (plant and machinery) is the backbone of ensuring projects run on schedule. Excavators, bulldozers, cranes, dump trucks, and batching plants worth billions of rupiah are used daily to expedite construction. The investment is substantial, so even the slightest malfunction can significantly impact productivity, costs, and safety. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":8306,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[60],"tags":[1346,186],"class_list":{"0":"post-8305","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-asuransi-konstruksi","8":"tag-asuransi-cpm","9":"tag-asuransi-konstruksi"},"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/8305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/comments?post=8305"}],"version-history":[{"count":1,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/8305\/revisions"}],"predecessor-version":[{"id":8307,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/8305\/revisions\/8307"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/media\/8306"}],"wp:attachment":[{"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/media?parent=8305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/categories?post=8305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/tags?post=8305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}