{"id":9244,"date":"2025-11-28T12:11:47","date_gmt":"2025-11-28T05:11:47","guid":{"rendered":"https:\/\/ligaasuransi.com\/?p=9244"},"modified":"2025-11-28T12:11:47","modified_gmt":"2025-11-28T05:11:47","slug":"salak-wayang-windu-menggebrak-jadi-proyek-geothermal-yang-siap-cod-di-2026","status":"publish","type":"post","link":"http:\/\/ligaasuransi.com\/en\/salak-wayang-windu-menggebrak-jadi-proyek-geothermal-yang-siap-cod-di-2026\/","title":{"rendered":"Salak &#038; Wayang Windu Make a Breakthrough! Geothermal Projects Ready for Cash-on-Delivery in 2026"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Our country, situated on the Pacific Ring of Fire, holds one of the world&#8217;s largest geothermal potentials. In 2026, this momentum will be further felt when two large-scale projects\u2014Salak Geothermal Power Plant Unit 7 And Wayang Windu Unit 3\u2014are expected to be ready for <\/span><i><span style=\"font-weight: 400;\">Commercial Operation Date <\/span><\/i><span style=\"font-weight: 400;\">(COD). These two projects are more than just additional electricity capacity: they symbolize Indonesia&#8217;s energy transformation toward a cleaner, more reliable, and more renewable future.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, building a geothermal power plant is no easy task. With risks associated with deep drilling, reservoir pressure, potential corrosive vapors, and environmental risks, projects like Salak and Wayang Windu require meticulous risk management. Without proper protection, even a small hiccup can become a major financial and technical disaster.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Here it isL&amp;G Insurance BrokerWe are here as a strategic partner. With experience in large energy projects, we can help you design an insurance program that covers construction risks, third-party liability, and technical drilling risks. With comprehensive protection, your geothermal project can proceed more smoothly, safely, and be better prepared for COD 2026.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Overview of the Salak &amp; Wayang Windu Geothermal Projects 2026<\/span><\/h3>\n<h4><span style=\"font-weight: 400;\">1. Salak Geothermal Project \u2013 A Long-Awaited Capacity Increase<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">The Salak area is known as one of the most productive geothermal fields in Indonesia. With the planned addition of a new unit (Unit 7), generating capacity is expected to increase significantly to support the electricity needs of Java and Bali. The project involves further exploration, drilling new wells, and installation of a power<\/span><i><span style=\"font-weight: 400;\"> plant <\/span><\/i><span style=\"font-weight: 400;\">which requires high precision. COD is targeted for completion in 2026 as part of the national renewable energy acceleration roadmap.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">2. Wayang Windu Unit 3 Project \u2013 Expansion of the Most Successful Geothermal Field<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Wayang Windu, managed by Star Energy, has become a benchmark for geothermal development in Indonesia. The addition of Unit 3 in 2026 will strengthen Wayang Windu&#8217;s position as one of the most stable and efficient geothermal producers. The project includes drilling production and injection wells, construction of surface installations (<\/span><i><span style=\"font-weight: 400;\">steam gathering system<\/span><\/i><span style=\"font-weight: 400;\">), as well as integration with existing units so that the performance reservoir remains optimal.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">3. Relevance of the Two Projects to the National Energy Target<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">The accelerated COD (Cost-Off) of these two projects has strategic implications. It not only increases the supply of renewable electricity but also helps the government achieve its 23% clean energy mix target. Furthermore, the success of these projects will serve as a strong signal to global investors that Indonesia&#8217;s geothermal sector is safe, viable, and promising.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Salak &amp; Wayang Windu Geothermal Project \u2013 Ready for COD in 2026<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Two geothermal projects that are currently in the spotlight are <\/span><b>Snakefruit<\/b><span style=\"font-weight: 400;\"> And <\/span><b>Wayang Windu<\/b><span style=\"font-weight: 400;\">, two strategic assets in green energy development in Indonesia. Both projects are currently in the accelerated construction phase and are targeted to reach <\/span><b>Commercial Operation Date (COD) in 2026 <\/b><span style=\"font-weight: 400;\">This achievement marks a significant milestone in the government and PLN&#8217;s efforts to increase the share of new and renewable energy (EBT) in the national energy mix.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">3.1 Salak Geothermal Expansion<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">The Salak Project is one of the largest geothermal fields in Indonesia. Its latest developments focus on increasing electricity production capacity through:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Optimization of existing wells to increase efficiency.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Drilling a new well designed to increase the supply of high-quality steam.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Modernization of steam gathering facilities so that the system is more stable and sustainable.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">With cutting-edge technology and support from geothermal experts, this project is projected to provide significant additional capacity to support Java\u2013Bali&#8217;s electricity needs.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">3.2 Wayang Windu Geothermal Optimization Project<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Wayang Windu is known as a high-temperature geothermal field with significant potential. The 2024\u20132026 optimization project emphasizes:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Upgrade turbine and plant equipment to increase electrical output.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Addition of injection wells to maintain the sustainability of the reservoir.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Implementation of a digital monitoring system which maximizes operational efficiency.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">These steps enable Wayang Windu to maintain its top performance while providing additional capacity to support the national renewable energy target.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">3.3 ImpactStrategic COD 2026<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">If these two projects successfully reach COD on time, the impact for Indonesia will be enormous:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Improving national electricity reliability especially in Java\u2013Bali.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reducing CO\u2082 emissions by replacing fossil-based energy.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Attracting global investors, because it shows Indonesia&#8217;s commitment to the energy transition.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Boosting the local economy through labor absorption and supply chain industry.<\/span><\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400;\">Why is Construction &amp; Operational Insurance Coverage So Important?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Geothermal projects like Salak and Wayang Windu are valuable investments.hundreds of millions of dollars, with technical risks that are far more complex than other power plant projects. Therefore, insurance coverage is not just a formality, but strategic components to maintain project continuity and financial stability of stakeholders.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">4.1 High Risks During Construction Phase<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">The geothermal construction phase has unique risk characteristics:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Geothermal well blowout due to unstable reservoir pressure.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Drilling rig damage which is of very high value.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ground movement &amp; subsidence which can damage the installation foundation.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Extreme weather and remote area access which increases the potential for logistical losses.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Without insurance protection such asConstruction\/Erection All Risks (CAR\/EAR) And Third Party Liability (TPL), losses can have fatal consequences, disrupt COD schedules and incur unexpected costs.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">4.2 Operational Risks After COD<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">As the plant begins operating, the challenges do not diminish:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Turbine &amp; generator damage due to high pressure and temperature.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Disturbance in the steam transmission line which can stop electricity production.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Erosion &amp; corrosion which accelerates equipment wear.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fire risk at the power plant facility.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Insurance such as <\/span><b>Property All Risks (PAR)<\/b><span style=\"font-weight: 400;\"> and <\/span><b>Machinery Breakdown (MB) <\/b><span style=\"font-weight: 400;\">become a primary need to maintain cash flow and continuity of operations.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">4.3 ObligationsContractualfrom Lenders &amp; Stakeholders<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Most geothermal projects are financed by:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Consortium bank<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor international<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Green financing institutions<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">These parties require a comprehensive insurance program,as a form of financial risk mitigation and investment protection. In other words, a project cannot proceed or receive funding without proper insurance.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">4.4 The Role of Insurance Brokers is Very ImportantCrucial<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Geothermal projects require brokers who:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Geothermal technical understanding<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Able to translate technical risks into appropriate policy wording<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Can negotiate the best rate with the insurer<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Manage large claims quickly and scalably<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">This is the role that L&amp;G Insurance Broker offers as a strategic partner (CTA will be put back later in the closing).<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">How Does L&amp;G Insurance Broker Support Geothermal Projects?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Geothermal projects like Salak and Wayang Windu require not only cutting-edge technology but also precisely designed risk protection. In the geothermal world, even a small error can trigger billions of rupiah in losses, and this is where L&amp;G Insurance Broker plays a strategic role, understanding the complexities of this industry.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">5.1 Technical Expertise in the Energy &amp; Geothermal Sector<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">L&amp;G doesn&#8217;t just act as a policy broker. We have a team of experts accustomed to handling major energy risks, including:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Drilling and workover<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Power plant construction project<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Steam transmission facilities<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">High-tech turbines, generators and electrical systems<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">With experience handling various oil and gas, renewable energy, and heavy industrial projects, L&amp;G is able to prepare risk assessments that comply with international standards.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">5.2 Preparing an Appropriate and Effective Insurance Program<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Each geothermal project has unique characteristics\u2014reservoir conditions, drilling technology, topography, and production capacity. Therefore, L&amp;G always creates tailor-made insurance programs.covers:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Construction All Risks \/ Erection All Risks<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Third Party Liability<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Delay in Start-Up (DSU\/ALOP)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Property All Risks<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Machinery Breakdown<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Business Interruption<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Liability &amp; environmental risks<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">We ensure that every policy wording covers the real risks a geothermal project may experience, not just general standards.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">5.3 Premium &amp; Capacity Negotiation with the Best Insurance Companies<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Geothermal projects require significant capacity and often involve international reinsurance. L&amp;G has a strong network in:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Leading national insurance company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Highly rated global reinsurer<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Underwriter specializing in construction, energy, and power generation<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">With a strong reputation and portfolio, L&amp;G is able to negotiate:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Best premium<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">More complete warranty extension<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Large capacity limit<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">More competitive deductibles<\/span><\/li>\n<\/ul>\n<h4><span style=\"font-weight: 400;\">5.4 Large Loss Handling<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">In the event of an incident, claims handling determines the fate of the project. L&amp;G has experience in:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Manage hundreds of claimsbillion<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Bridging communication between contractors, insurers, and loss adjusters<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ensure claims are processed quickly and according to coverage<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Protecting the client&#8217;s position from potential rejection<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">With the support of legal and technical teams, clients do not need to worry about facing a complicated claims process.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">5.5 Supporting Indonesia&#8217;s Commitment to Clean Energy<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">As a broker committed to the renewable energy sector, L&amp;G supports the acceleration of:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Transition energy national<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Increasing renewable energy-based electricity capacity<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reducing carbon emissions<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Sustainable green investment<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Geothermal projects are the future of Indonesia&#8217;s energy, and L&amp;G is ready to be a key part of that journey.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Conclusion<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Acceleration of geothermal projects such asSnakefruit And Wayang Windumarks a crucial chapter in Indonesia&#8217;s energy transition journey towards 2026. With geothermal potential among the world&#8217;s largest, the success of these projects is not only about meeting national electricity needs, but also strengthening energy security, reducing emissions, and opening up significant investment opportunities. However, despite this potential, geothermal projects remain high risk\u2014from drilling failures, unforeseen geological risks, construction disruptions, to financial losses due to operational delays. Without proper safeguards, losses could reach hundreds of billions to trillions of rupiah.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This is where the role of a professional insurance broker becomes very important.L&amp;G Insurance BrokerWe are here to ensure every stage of a project, from construction to operation, is protected with guarantees best suited to the characteristics of the geothermal industry. With extensive experience handling large-scale energy projects, strong negotiation capabilities, and proven effective claims management, L&amp;G is ready to be your strategic partner in navigating the complex risks of the geothermal sector.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If you want to ensure your geothermal project is safe, efficient and fully protected,contact L&amp;G Insurance Broker nowIt&#8217;s time to realize Indonesia&#8217;s green energy development without compromising on risks.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u2014<\/span><\/p>\n<p><b>DON&#8217;T WASTE YOUR TIME AND SECURE YOUR FINANCIAL AND BUSINESS WITH THE RIGHT INSURANCE.<\/b><\/p>\n<p><b>HOTLINE L&amp;G 24 JAM:<\/b><a href=\"https:\/\/wa.me\/628118507773?text=Halo%20Liberty,%20Saya%20sudah%20berkunjung%20ke%20website%20lngrisk.co.id.%20Boleh%20saya%20tanya%20lebih%20jauh?\"><b> 0811-8507-773<\/b><\/a><b> (CALL \u2013 WHATSAPP \u2013 SMS)<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Website: <\/span><a href=\"http:\/\/lngrisk.co.id\"><span style=\"font-weight: 400;\">lngrisk.co.id<\/span><\/a><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Email: <\/span><a href=\"mailto:halo@lngrisk.co.id\"><span style=\"font-weight: 400;\">halo@lngrisk.co.id<\/span><\/a><span style=\"font-weight: 400;\">\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u2014<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Our country, situated on the Pacific Ring of Fire, holds one of the world&#8217;s largest geothermal potentials. In 2026, this momentum will be further felt when two large-scale projects\u2014Salak Geothermal Power Plant Unit 7 And Wayang Windu Unit 3\u2014are expected to be ready for Commercial Operation Date (COD). These two projects are more than just [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":9245,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[1471,216,243],"class_list":{"0":"post-9244","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-asuransi-pembangkit-listrik","8":"tag-asuransi-geothermal","9":"tag-asuransi-pembangkit-listrik","10":"tag-asuransi-power-plant"},"post_mailing_queue_ids":[],"_links":{"self":[{"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/9244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/comments?post=9244"}],"version-history":[{"count":1,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/9244\/revisions"}],"predecessor-version":[{"id":9246,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/9244\/revisions\/9246"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/media\/9245"}],"wp:attachment":[{"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/media?parent=9244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/categories?post=9244"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/tags?post=9244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}