{"id":9005,"date":"2025-11-07T16:05:56","date_gmt":"2025-11-07T09:05:56","guid":{"rendered":"https:\/\/ligaasuransi.com\/?p=9005"},"modified":"2025-11-07T16:05:56","modified_gmt":"2025-11-07T09:05:56","slug":"kecelakaan-proyek-di-cianjur-bikin-klaim-tersendat-asuransinya-tidak-sesuai-kontrak","status":"publish","type":"post","link":"http:\/\/ligaasuransi.com\/en\/kecelakaan-proyek-di-cianjur-bikin-klaim-tersendat-asuransinya-tidak-sesuai-kontrak\/","title":{"rendered":"A project accident in Cianjur has stalled claims: insurance coverage was not in line with the contract."},"content":{"rendered":"<p><\/p>\n<h3><span style=\"font-weight: 400;\">The Infrastructure Project Boom in Bogor and Surrounding Areas<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">In recent years, Bogor and Cianjur regencies have become centers of major infrastructure development \u2014 from new toll roads and inter-regional bridges to housing projects and tourism and energy facilities.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Hundreds of contractors and subcontractors are involved, some using Engineering, Procurement, and Construction (EPC) schemes that involve many parties, many risks, and of course many potential problems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, amidst the boom in construction projects, fundamental errors in insurance arrangements are still common. As a result, when accidents occur on the job, insurance claims are stalled\u2014even though the project is already behind schedule and funding has run out.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">One of the most interesting cases occurred in the Cugenang area, Cianjur, where a public facility construction project was completely halted because the contractor&#8217;s insurance claim could not be paid due to a discrepancy between the policy and the project contract.<\/span><\/p>\n<p><b>Claim Failed Due to Incorrect Policy Format<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A local contractor company won the tender for a government building construction project worth Rp 75 billion in Cianjur.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">According to the contract with the local government, they are required to have:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Contractor\u2019s All Risks (CAR) Insurance<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Third Party Liability (TPL) Insurance<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">These two policies must be issued in the joint name (joint insured) between the local government as principal, main contractor, and supervising consultant.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Unfortunately, in a rush, the contractor purchased a CAR policy from an insurance company through an agent, without paying attention to the clauses and underwriting structure required in the contract.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Several months later, while the casting of the third floor was underway, the scaffolding collapsed and hit workers and passing vehicles.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Losses reached more than Rp 2 billion, including structural damage and compensation to third parties.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, when the contractor filed a claim, the insurance rejected it on administrative and technical grounds:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The name of the insured does not match the project contract.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">There is no endorsement that includes the principal (local government).<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">There is no extension of guarantee for \u201csurrounding property\u201d and \u201ccross liability\u201d.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Some work items are not included in the schedule of insured work values.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Ultimately, the claim failed to be processed. The project stalled for months, the contractor was penalized, and the project owner&#8217;s reputation was damaged.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This case demonstrates the devastating consequences of mistakes in preparing project insurance documents \u2014 mistakes that could have easily been prevented if a professional insurance broker had been on hand from the start.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Why Are There Many Failed Project Claims in Bogor and Cianjur?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Based on the experience of PT. Liberty and General Insurance Broker (L&amp;G), which has handled dozens of EPC, infrastructure, and construction projects in West Java, there are five main reasons why project insurance claims often fail or are delayed for a long time.<\/span><\/p>\n<ol>\n<li><b> The policy does not comply with the contract requirements.<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Many contractors don&#8217;t read the details of their work contracts, even though they often contain important clauses such as:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">\u201cInsurance to be arranged jointly in the name of Owner, Contractor, and Consultant.\u201d<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">\u201cPolicy must include waiver of subrogation and cross liability.\u201d<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">\u201cSum insured must cover full contract value, including temporary works.\u201d<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">If this clause is not followed exactly, the policy is deemed to be out of contract and may be rejected by both the project owner and the insurance company.<\/span><\/p>\n<ol start=\"2\">\n<li><b> Purchasing Insurance Directly Without Broker Assistance<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Because it is considered just a formality, many contractors buy policies directly from insurance agents without detailed explanation.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">In fact, the agent only represents the interests of the insurance company, not the interests of the insured.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As a result, many important things are overlooked \u2014 such as the definitions of \u201ccontract site,\u201d \u201cmaintenance period,\u201d and \u201cprincipal inclusion.\u201d<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">When a claim occurs, the contractor realizes that their policy was not designed for the project at hand.<\/span><\/p>\n<ol start=\"3\">\n<li><b> The insurance value does not match the contract value.<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Often contractors insure projects based only on the value of the primary materials (e.g. concrete and steel structures), without including important components such as:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Temporary works costs<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">MEP installation costs<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Labor and supervision costs<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Profit margin<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">In fact, in an EPC contract, all of these elements are part of the project value that must be insured.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">When a large claim occurs, insurance calculates compensation based on the insured value alone \u2014 as a result, claims are paid for only a fraction of the actual loss.<\/span><\/p>\n<ol start=\"4\">\n<li><b> No Expansion for Additional Risks<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Construction projects in the Bogor and Cianjur areas are vulnerable to additional risks such as:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Earthquakes, floods and landslides<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Design errors or construction failures<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Damage to surrounding property (<\/span><i><span style=\"font-weight: 400;\">surrounding property<\/span><\/i><span style=\"font-weight: 400;\">)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Third party injury<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Unfortunately, many policies do not include this extended coverage, so claims related to disasters or third parties are immediately rejected.<\/span><\/p>\n<ol start=\"5\">\n<li><b> Incomplete Claim Documentation<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Many contractors have difficulty preparing the documents requested by insurance companies when making claims, such as:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Chronological photos before and after the incident<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Internal and third-party investigation reports<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Work plan (method statement)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Proof of value of damaged work<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Without complete documentation,<\/span><i><span style=\"font-weight: 400;\">loss adjuster<\/span><\/i><span style=\"font-weight: 400;\">unable to verify claims, and ultimately the case drags on without resolution.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">The Strategic Role of L&amp;G Insurance Brokers in Construction Projects<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">As an independent insurance broker, L&amp;G Insurance Broker has extensive experience in handling EPC, infrastructure, and public development project insurance in Indonesia \u2014 including in the Bogor, Cianjur, and Sukabumi areas.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Here&#8217;s how L&amp;G helps contractors and project owners avoid mistakes like the one above.<\/span><\/p>\n<ol>\n<li><b> Review and Adjustment of Insurance Contracts<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">L&amp;G reviewed all contract documents (especially the<\/span><i><span style=\"font-weight: 400;\">Insurance Requirement Clause<\/span><\/i><span style=\"font-weight: 400;\">) to ensure that every provision is reflected in the policy.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">The result: the policy fully meets the contractual requirements and is acceptable to both the project owner and the supervising consultant.<\/span><\/p>\n<ol start=\"2\">\n<li><b> Preparation of a Comprehensive Insurance Program<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">L&amp;G designed an insurance program consisting of:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Contractor\u2019s All Risks (CAR) \u2013 Covers physical damage to construction work.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Third Party Liability (TPL) \u2013 Guarantees legal liability to third parties.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Workmen\u2019s Compensation \/ Personal Accident \u2013 \u200b\u200bProtects project workers from injury or death.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Equipment All Risks (EAR) \u2013 Covers heavy equipment at the project site.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Professional Indemnity (PI) \u2013 Covers the liability of consultants and designers.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Delay in Start-Up (DSU) \u2013 Protects against potential financial losses due to delays in project completion.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">All are arranged with additional clauses as needed such as<\/span><i><span style=\"font-weight: 400;\">cross liability<\/span><\/i><span style=\"font-weight: 400;\">, <\/span><i><span style=\"font-weight: 400;\">principal inclusion<\/span><\/i><span style=\"font-weight: 400;\">, <\/span><i><span style=\"font-weight: 400;\">automatic reinstatement<\/span><\/i><span style=\"font-weight: 400;\">, And <\/span><i><span style=\"font-weight: 400;\">maintenance cover.<\/span><\/i><\/p>\n<ol start=\"3\">\n<li><b> Negotiate the Best Premium and Policy Terms<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">As an independent broker, L&amp;G is not tied to any one insurance company.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">The L&amp;G team will select and negotiate offers from various reputable companies to obtain competitive premiums and the most comprehensive coverage.<\/span><\/p>\n<ol start=\"4\">\n<li><b> Monitoring and Certificate of Insurance (COI) According to the Project<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">For government or state-owned enterprise projects, each contractor is required to submit a Certificate of Insurance (COI) which shows the validity of the policy.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">L&amp;G ensures that all certificates are issued in accordance with the work contract, including the inclusion of the names of all relevant parties.<\/span><\/p>\n<ol start=\"5\">\n<li><b> Full Assistance During Claims<\/b><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">When an accident occurs, the L&amp;G claims team immediately steps in to help:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Prepare claim reports according to insurance format,<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Prepare evidence and photos of the incident,<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Coordinate communication with<\/span><i><span style=\"font-weight: 400;\">loss adjuster<\/span><\/i><span style=\"font-weight: 400;\">,<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Negotiate claim settlement to get paid in full and quickly.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">The result: claims are paid, projects are not delayed, and relations with the principal remain good.<\/span><\/p>\n<p><b>Case Study: Successful Claims After L&amp;G Assistance<\/b><\/p>\n<p><span style=\"font-weight: 400;\">One of L&amp;G&#8217;s clients, an EPC company handling a bridge project in East Bogor, experienced a temporary collapse of the formwork during pier casting.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">The loss was around Rp. 1.8 billion.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Initially, the insurance company refused because it was considered to be due to \u201cdefective workmanship.\u201d<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">However, L&amp;G looked into the policy details and found a \u201cLEG 2\/96 clause\u201d which provided coverage for physical damage due to faulty workmanship.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With technical arguments and field evidence, L&amp;G managed to convince<\/span><i><span style=\"font-weight: 400;\">loss adjuster<\/span><\/i><span style=\"font-weight: 400;\">.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">As a result, the claim was paid in full within 45 days.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">The project was completed on time, and the contractor&#8217;s reputation was maintained.<\/span><\/p>\n<p><b>Important Lessons for Contractors and Project Owners in Bogor-Cianjur<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Project insurance is not just a formality, but a vital part of risk management.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Every detail of the contract must be reflected in the policy.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Avoid purchasing insurance directly without professional assistance.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ensure that the policy value and coverage match the actual project conditions.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Use an experienced broker to help with the claims process.<\/span><\/li>\n<\/ul>\n<p><b>Why Choose L&amp;G Insurance Broker<\/b><\/p>\n<p><span style=\"font-weight: 400;\">\u2705<\/span><span style=\"font-weight: 400;\">Over 30 years of experience in project and industrial insurance.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2705<\/span><span style=\"font-weight: 400;\">Has handled EPC projects worth hundreds of millions of dollars throughout Indonesia.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2705<\/span><span style=\"font-weight: 400;\">Professional technical and claims team with in-depth understanding of FIDIC contracts and international insurance standards.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2705<\/span><span style=\"font-weight: 400;\">Work independently and on the client&#8217;s side.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2705<\/span><span style=\"font-weight: 400;\">Registered and supervised by the Financial Services Authority (OJK).<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Conclusion: Accidents Can Happen, But Claims Must Not Fail<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">In the construction industry, the risk of accidents is unavoidable. However, financial losses can be minimized if the project is supported from the outset by properly designed insurance and supported by a professional broker like L&amp;G.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Failed claims are often not due to disaster, but due to lack of knowledge and assistance.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Don&#8217;t let administrative errors destroy your reputation and project&#8217;s viability.<\/span><\/p>\n<p><b>\ud83d\udd39<\/b><b>Contact L&amp;G Insurance Broker Now<\/b><\/p>\n<p><span style=\"font-weight: 400;\">For free consultation regarding construction project insurance and EPC in the Bogor, Cianjur and surrounding areas:<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\ud83d\udce7<\/span><span style=\"font-weight: 400;\"> info@lngrisk.co.id<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\ud83c\udf10<\/span><span style=\"font-weight: 400;\"> www.lngrisk.co.id<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\ud83d\udcde<\/span><span style=\"font-weight: 400;\"> (+62) 21-xxxx-xxxx<\/span><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>The Infrastructure Project Boom in Bogor and Surrounding Areas In recent years, Bogor and Cianjur regencies have become centers of major infrastructure development \u2014 from new toll roads and inter-regional bridges to housing projects and tourism and energy facilities. Hundreds of contractors and subcontractors are involved, some using Engineering, Procurement, and Construction (EPC) schemes that [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":9006,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[1423,560],"class_list":{"0":"post-9005","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-risk-recommendation","8":"tag-bogor","9":"tag-risk-recommendation"},"post_mailing_queue_ids":[],"_links":{"self":[{"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/9005","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/comments?post=9005"}],"version-history":[{"count":1,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/9005\/revisions"}],"predecessor-version":[{"id":9007,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/posts\/9005\/revisions\/9007"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/media\/9006"}],"wp:attachment":[{"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/media?parent=9005"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/categories?post=9005"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/ligaasuransi.com\/en\/wp-json\/wp\/v2\/tags?post=9005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}